Modular Data Center Technology for GPU Clusters | Syaala
Technology Overview

Infrastructure
Built for AI

Two deployment models. One mission: get your AI workloads running at the speed your business demands.

Modular Data Centers

Factory Built. Field Ready.

Factory built modules, acceptance tested before shipment, ready for service in 4 to 8 months.

1.6 MW Block, 8 Positions to 200 kW

The 1.6 MW Block: 8 rack positions up to 200 kW, GB300 NVL72 class, with direct-to-chip liquid cooling.

Integrated Liquid Cooling

Direct-to-chip and rear-door heat exchangers. Coolant distribution units sized to the block's full heat load.

N+1 Redundancy

N+1 standard, N or 2N available.

Explore Modular Data Centers

1.6 MW Block Specifications

Form Factor Factory built module
Rack Positions 8 positions
Power Capacity 1.6 MW
Cooling Direct to chip liquid, warm water loop
Redundancy N+1 standard, N or 2N available
Deployment Time 4 to 8 Months
Turnkey GPU Infrastructure

Power-Ready Positions

Sites chosen for utility power and fibre, with the same liquid-cooled block on every one. Designed for GB300 and B300 class racks.

Colocation Position Specs

Location Texas, Southeast, Mid-Atlantic
Standard Block 1.6 MW, 8 rack positions
Rack Classes GB300 and B300 class
Max Rack Density 20 to 250 kW per rack
Network Multi-carrier fibre, per site fit
Site Fit Confirmed in writing

Purpose-Built Facility

Designed for GPU workloads, with liquid cooling and power sized for GB300 and B300 class racks.

Enterprise Security

Site security and access are confirmed in the written site fit.

Carrier-Neutral

Carrier options and fibre paths are confirmed in the written site fit.

Explore Colocation

Choose Your Deployment Model

Different needs, different solutions. All optimized for AI workloads.

Modular Data Centers

Factory built blocks and zones. Deploy on your site. Full control.

  • 1.6 MW Block, 4.8 MW B300 Block, 9 MW Zone
  • 4 to 8 months to ready for service
  • 20 to 250 kW per rack
Learn more
POWER-READY

Power-Ready Colocation

We build your capacity. You move in ready to deploy.

  • Built to your specification on sites with power
  • Typically 4 to 8 months to ready for service
  • 20 to 250 kW per rack, GB300 and B300 class
Learn more

Ready to Deploy?

Whether you need a modular data center or colocation capacity, we will help you find the right infrastructure solution.