About Syaala Modular Data Centers Company | Syaala
United States · GB300 and B300 class

Modular capacity
for AI, where
the power is.

Syaala designs factory-built, liquid-cooled modular data centers for GB300 and B300 class GPUs, and places them on power-ready U.S. sites. Pre-tested, repeatable, and ready for service in 4 to 8 months.

1.6 MW
Standard Block
GB300 / B300
Rack Classes
4 to 8 months
Order to Ready for Service
TX · Southeast · Mid-Atlantic
Where We Place Capacity
Who We Are

AI infrastructure shouldn't take 18 months to build.

Traditional data center construction takes 18 to 24 months. Power capacity is scarce, and the sites that have it are the constraint. Syaala pairs a repeatable factory-built block with sites where utility power is already in place, so capacity can be ready for service in 4 to 8 months.

One team takes the work from design through commissioning: U.S.-led engineering, site strategy and utility coordination, backed by manufacturing and delivery partners with decades of industrial experience.

One Repeatable Block

A 1.6 MW block with eight rack positions, liquid-cooled for GB300 and B300 class racks. Sites scale in whole blocks, so every deployment starts from the same tested block design.

Power-Ready Sites

We work with site and power owners across Texas, the Southeast and the Mid-Atlantic, with utility service in place or on a confirmed path. Own land or power? Tell us about your site.

Factory-Built Quality

Every module is assembled in controlled factory conditions and acceptance tested before it ships. It arrives at your site ready to connect.

Capacity

Three sizes. One cooling approach.

The 1.6 MW Block, the 4.8 MW B300 Block and the 9 MW Zone. Direct-to-chip liquid cooling on a warm-water loop, and 4 to 8 months to ready for service.

1.6 MW Block

GB300 NVL72 class, eight positions at 200 kW, with a 250 kW option. N+1 standard, N or 2N available.

See the product line

4.8 MW B300 Block

32 positions at 150 kW, N+1 in each half. Direct-to-chip liquid cooling on a warm-water loop.

See the product line

9 MW Zone

Four power paths, and any three carry the load. Vera Rubin class racks go to 250 kW, set pod by pod.

See the product line
How We Work

One team, from design to commissioning.

Syaala is a U.S.-led engineering and delivery team. Site strategy, utility coordination and commissioning sit with the same team that designs the block.

Power and Cooling Engineering

Power distribution and cooling are engineered as one system for liquid-cooled GPU racks, designed to North American codes. Redundancy is N+1 standard, with N or 2N available.

Liquid Cooling Power Distribution N+1 Standard

Factory-Built Quality

Modules are assembled and acceptance tested in controlled factory conditions before they ship, so site work starts from a tested block rather than field assembly.

Factory-Built Acceptance Tested

Site Delivery

Site works, utility coordination and commissioning are planned with the block, so the site and the modules follow one programme to ready for service.

Site Preparation Commissioning

Every module is factory-built and acceptance tested before it ships.

Leadership

Standards

Designed to North American standards.

Each block is designed for U.S. code compliance, including the National Electrical Code. Battery energy storage is designed to UL 9540 and NFPA 855. Component listing is confirmed per project.

UL 9540

Battery energy storage, designed to UL 9540

NEC

National Electrical Code design basis for distribution and working space

NFPA 855

Battery energy storage separation and fire protection

ASHRAE

Thermal guidelines for data center cooling

Ready to plan your next capacity step?

Tell us your capacity requirements and timeline. We'll build a plan around your workload.