Modular data centers engineered for AI workloads. Factory-built. Acceptance tested. Typically ready for service in 4 to 8 months.
AI infrastructure shouldn't require 18-month construction projects. Cloud costs shouldn't be unpredictable. Capacity shouldn't be the bottleneck to innovation.
We engineer modular data centers that deploy in 4-8 months: factory-built, pre-tested, and ready to run GPU workloads at scale.
Every module is built in controlled factory conditions, not assembled in the field. Consistent quality, rigorous testing, no weather delays.
Major equipment is specified by name for each project, and every module is acceptance tested in the factory before it ships.
Designed and engineered by a U.S.-led team with decades of experience in data center design and thermal management.
Every size is designed to the U.S. codes for safety, reliability and performance. Third-party evaluation is arranged per project.
Designed to the National Electrical Code
Battery storage designed to both
Designed to the recommended thermal envelope
Field evaluation arranged per project
Tell us about your infrastructure needs.