About Syaala Containers: Modular Data Centers
Back to Containers
About Syaala Containers

We Build
Infrastructure
That Ships

Modular data centers engineered for AI workloads. Factory-built. Acceptance tested. Typically ready for service in 4 to 8 months.

4 to 8 Months to Service
1.6 to 9 MW Per Step
250 kW Per Rack
Syaala modular data center unit, factory-finished and ready for deployment
Precision thermal management

AI infrastructure shouldn't require 18-month construction projects. Cloud costs shouldn't be unpredictable. Capacity shouldn't be the bottleneck to innovation.

We engineer modular data centers that deploy in 4-8 months: factory-built, pre-tested, and ready to run GPU workloads at scale.

4 to 8 Months to Ready for Service
1.6 to 9 MW Per Step
250 kW Per-Rack Ceiling
Modular data center units in transport
Built to be deployed where the power is

Our Approach

Specified Components

Major equipment is specified by name for each project, and every module is acceptance tested in the factory before it ships.

Named in every RFQ Factory acceptance tested

U.S. Engineering

Designed and engineered by a U.S.-led team with decades of experience in data center design and thermal management.

U.S.-led engineering GB300 and B300 class

Standards & Compliance

Every size is designed to the U.S. codes for safety, reliability and performance. Third-party evaluation is arranged per project.

NEC

Designed to the National Electrical Code

UL 9540 and NFPA 855

Battery storage designed to both

ASHRAE TC 9.9

Designed to the recommended thermal envelope

NRTL

Field evaluation arranged per project

Engineering standards for modular data centers

Let's Build Something

Tell us about your infrastructure needs.