Pay up front (modular build)
Full build cost at the start, then power only. No monthly hosting charge and no interest cost.
- Full asset ownership and control
- No interest cost
- Highest cash outlay at the start
Three ways to pay for the same capacity, shown as ranges. Set your capacity and horizon, then read each total as a low to high range built from the assumptions listed at the bottom of this page.
Visitor input. Drives the power cost only. Colocation hosting is charged on contracted capacity.
Visitor input. Use the rate your lender has quoted you. It is not a Syaala figure.
Visitor input. The rest of the build cost is repaid in equal monthly payments over the horizon.
Schedule, for context: modular capacity and a colocation position are each ready for service in 4 months to 8 months. A conventional build takes 18 months to 24 months, before any utility wait. At the idle capital range listed below, the 10 months to 20 months difference on 5 MW is worth $40.0M to $200.0M in avoided idle GPU capital.
Modular, pay up front (headline)
$30.1M to $61.3M
Build cost plus power. No hosting charge, no interest.
Modular, financed
$33.5M to $67.3M
Down payment plus payments over 5 years at 8% (visitor input), plus power.
Colocation
$49.1M to $104.3M
Hosting on contracted capacity plus power passed through. No build cost.
Conventional build, pay up front
$56.8M to $150.1M
Conventional build cost plus air-cooled power, for comparison.
Each band runs from the low end of the range to the high end, on one scale from zero. Figures are totals over the chosen horizon, not prices.
Full build cost at the start, then power only. No monthly hosting charge and no interest cost.
A down payment, then monthly payments that repay the loan over the chosen horizon, plus power. Total cash over the horizon is higher than paying up front by the interest charged. Change the rate and down payment above to test your own terms.
No build cost. A monthly hosting charge on contracted capacity plus power passed through. The total over a short horizon is often lower; over a long horizon the monthly charge accumulates. Syaala prices each project in writing after a site fit, so treat the hosting range here as a planning assumption only, not a Syaala price.
By scale, as a starting point only: at 1 to 5 MW, compare colocation and financing first, because the build cost is spread or avoided. At 5 to 20 MW, run the financed and up-front ranges alongside colocation, because ownership starts to matter over a longer horizon. Run the ranges above at your own capacity and horizon before treating any of this as a recommendation.
Your current inputs and the low to high totals above, sent as a short summary. No price is quoted in it.
Ranges plan a budget. A written site fit prices a project. Talk to the team with your capacity, site and term.