MODULAR DATA CENTERS
Factory-built modules engineered for GPU workloads. Direct-to-chip liquid cooling for GB300, B300 and Vera Rubin class racks.
Legacy facilities can't cool 40+ kW racks without $2M+ electrical retrofits. Your GPU fleet needs power density, not a renovation.
14-month utility interconnect timelines strand $6M+ in GPU capital. Every week of delay is revenue left on the table.
You need rack-level power density. Not a construction project.
Factory-built modules designed for the workloads traditional facilities weren't built for.
Power availability, utility interconnect requirements, and site prep review. Configuration lock within 48 hours of assessment.
Week 1-2BOM finalization, vendor coordination, and structural engineering. All components sourced from tier-1 OEM partners.
Week 3-5Precision assembly, electrical testing, thermal validation. Full factory acceptance testing before shipment.
Week 5-9Transport to site, installation, site acceptance testing. Commissioning and energization with full documentation.
Week 10-13Every size is designed to:
The load is carried with any one unit out:
Before delivery:
The technical datasheet: all three sizes, their modules, rack densities, redundancy and site fit
Explore other ways to deploy your infrastructure.