Direct-to-chip liquid cooling
Factory acceptance tested
Battery-integrated power
1.6 MW to 9 MW per step
Three sizes

Three steps of capacity on one platform. Blocks and zones add in place on the same site, from one block to a 50 MW campus.

02 MW4 MW6 MW8 MW10 MW1.6 MW Block4.8 MW B300 Block9 MW ZoneThe building blockB300 classFor 10 MW sites and up1.6 MW · 8 racks to 200 kW · N+1, 2N option4.8 MW · 32 racks at 150 kW · N+1 per halfabout 9 MW
The building block

1.6 MW Block

1.6 MW 8 rack positions · up to 200 kW each

The step that repeats. A self-contained, liquid-cooled module set with its own power, battery and cooling plant, sized for GB300 NVL72 class racks. Added one at a time as capacity is needed.

Rack positions 8, each provisioned up to 200 kW
Rack platform GB300 NVL72 class, 130 to 150 kW per rack
Modules IT, power, energy storage and pump modules, with dry coolers
Power N+1 standard; 2N option with separate A and B paths
Cooling Direct-to-chip warm-water loop; dry coolers N+1; no cooling towers
Delivery Typically 4 to 8 months to ready for service
GB300 NVL72AI trainingInferenceGPU cloud
Questions? Contact us
B300 class

4.8 MW B300 Block

4.8 MW 32 rack positions · 150 kW each

Designed around liquid-cooled HGX B300 racks with in-rack cooling distribution. Two rack wings share a central service spine: cooling water runs under the floor and power runs overhead.

Rack positions 32 at 150 kW
Rack platform Liquid-cooled HGX B300, in-rack cooling distribution and rear doors
Modules Two rack wings and a service spine, power and energy storage for each half, a pump module, dry coolers
Power N+1 in each half of the block
Cooling Direct-to-chip warm-water loop; dry coolers N+1; no cooling towers
Delivery Typically 4 to 8 months to ready for service
HGX B300AI trainingInference
Questions? Contact us
For 10 MW sites and up

9 MW Liquid-Cooling Zone

About 9 MW 66 rack bays in three pods

A zone of factory-built power and cooling kits inside a one-storey hall, in three pods. GB300 and Vera Rubin class racks share the same zone: only the rack taps and cooling distribution change.

Rack bays 66 in three pods; 60 GB300 racks at 150 kW
Vera Rubin Up to 250 kW per rack, set pod by pod
Power Four independent paths, any three carry the zone; every rack fed from four sources
Cooling Warm-water loop to adiabatic coolers; chillers 2+1 for residual air
Housing Factory-built kits inside a hall built by the site contractor
Phasing Opens in thirds, from 3 MW
GB300Vera RubinCampus scale
Questions? Contact us

Want the full specifications?

The technical datasheet covers all three sizes: the modules, rack densities, redundancy and site fit.

Explore Custom Solutions

Images show the design as planned. All capacities, densities, counts and schedules are indicative design values, subject to site-specific engineering, rack selection and final configuration at order. Redundancy descriptions refer to the design and are not an Uptime Institute certification.