Traditional data center builds take 18+ months and $50M+ for full facilities. A 1.6 MW block, a 4.8 MW B300 block or a 9 MW zone delivers liquid-cooled capacity at up to 250 kW per rack, typically in 4 to 8 months.
Average time to deploy a traditional data center. Site selection, permitting, construction, commissioning.
Typical cost for a 10MW facility. Capital-intensive, long payback periods, high risk.
Build for peak demand day one. Stranded capacity, inefficient utilization, wasted investment.
Modules are built in the factory while the site is prepared, so most of the work never waits on site construction or weather.
A defined product at a defined scope: less exposure to construction overruns and change orders than a site-built facility.
Start with what you need. Add capacity as demand grows. Match infrastructure to actual requirements.
Purpose-built for GPU workloads: 130 to 250 kW per rack with direct-to-chip liquid cooling.
Factory precision beats field construction: consistent builds and acceptance testing before anything ships.
Deploy anywhere. Your campus, a colo, a remote site. Relocatable if needs change.
Compare the total cost of ownership between modular and traditional infrastructure. Factor in time-to-revenue, capital efficiency, and operational costs.
Indicative. Modular time runs from order to ready for service and depends on equipment reservation and site readiness; site power and GPU hardware are separate.
GB300 and B300 clusters run at 130 to 150 kW per rack, and Vera Rubin class racks to 250 kW. Most existing facilities can't cool that density, and new builds take too long. Modular delivers liquid-cooled capacity in 4 to 8 months.
Energy companies, mining operations, and defense installations need compute in locations without existing infrastructure. Modular provides self-contained data centers anywhere.
Enterprises hitting capacity limits can't wait 18 months. Modular adds compute to existing campuses with little site construction and no disruption to operations.
Modular data centers are no longer emerging; they're the strategic choice for hyperscalers, enterprises, and AI companies worldwide.
A major electrical OEM launches modular data centers designed for AI, ML, and edge computing workloads.
Read moreHyperscalers choose modular construction to accelerate deployment of AI infrastructure.
Read moreSource: Mordor Intelligence, Modular Data Center Market Report, 2024
Get a custom quote for your modular data center deployment.