Delay calculator
The cost of waiting.
Idle GPU capital and the monthly revenue you set, while capacity is not in service. A conventional build plus a utility wait, set against a modular data center. Every result is a range.
Your inputs
Ranges
Conventional wait minus modular wait
$60.0M to $240.0M
10 to 20 months of idle capital and the revenue you set. The two waits share one capital rate.
Modular in-service
$24.0M to $96.0M
4 to 8 months. The schedule itself is 4 to 8 months. A new line can pace the date.
Conventional in-service
$108.0M to $288.0M
18 to 24 months. Build, plus the utility wait when a new line is included.
30 days
$6.0M to $12.0M
One month of idle capital and revenue.
60 days
$12.0M to $24.0M
Two months.
90 days
$18.0M to $36.0M
Three months.
0 to 24 months. Each bar is the low to high band.
Power is marked already available, so the utility wait is not added. Where a new line is needed, that wait is 24 to 78 months. With a new line, conventional construction is modelled as starting after the utility wait, the pessimistic end for the conventional path.