Cost of Waiting Calculator | Syaala

Delay calculator

The cost of waiting.

Idle GPU capital and the monthly revenue you set, while capacity is not in service. A conventional build plus a utility wait, set against a modular data center. Every result is a range.

Your inputs

5 MW
1 MW50 MW
$2.0M
$100K$10M
Utility line
Project stage

Recorded with your request. It does not change the ranges.

Ranges

Conventional wait minus modular wait

$60.0M to $240.0M

10 to 20 months of idle capital and the revenue you set. The two waits share one capital rate.

Modular in-service

$24.0M to $96.0M

4 to 8 months. The schedule itself is 4 to 8 months. A new line can pace the date.

Conventional in-service

$108.0M to $288.0M

18 to 24 months. Build, plus the utility wait when a new line is included.

30 days

$6.0M to $12.0M

One month of idle capital and revenue.

60 days

$12.0M to $24.0M

Two months.

90 days

$18.0M to $36.0M

Three months.

Months to in-service
Syaala schedule 4 to 8
Modular in-service 4 to 8
Conventional in-service 18 to 24

0 to 24 months. Each bar is the low to high band.

Power is marked already available, so the utility wait is not added. Where a new line is needed, that wait is 24 to 78 months. With a new line, conventional construction is modelled as starting after the utility wait, the pessimistic end for the conventional path.

Send the full analysis

A PDF of these ranges, with the assumptions and the disclaimer.